Why is Tower Bridge painted blue and white?
BLUE, WHITE AND VICTORIAN GOTHIC
The history behind Tower Bridge's towers, its opening mechanism, and the color scheme visitors notice today.
Read on
The answer in full
Why it matters
Tower Bridge is the picture most visitors carry away from the Thames, a Grade I listed structure that combines bascule, suspension and, until 1960, cantilever engineering. It was designed by Horace Jones and the engineer John Wolfe Barry and built between 1886 and 1894. The bridge remains a working crossing, carrying more than forty thousand motorists, cyclists and pedestrians every day.

The name causes real confusion. This is not London Bridge, which stands about half a mile upstream, and it is not the Tower of London, which stands at its north end. A popular story claims that an American who bought the old London Bridge in 1968 thought he was buying this one; both the buyer and the seller later denied it.
Visitors planning a river-based day often pair the bridge with a wider look at the water that shapes the city, covered on the Thames page, or treat it as one stop on a longer walk through the historic core of London, taking in the Tower and the City beyond it.
Why a bridge that opens
By the late nineteenth century the East End of London was growing fast, and people wanted a crossing downstream of London Bridge. A fixed span at street level could not be built, because it would have cut sailing ships off from the docks of the Pool of London between London Bridge and the Tower.
A committee formed in 1875 collected more than fifty designs for the new crossing, among them one from the engineer Joseph Bazalgette, which was rejected for lack of headroom. In 1884 the committee settled on a low-level bridge with a mechanical opening, a compromise between road traffic and river traffic.

The Act of Parliament that authorized the bridge, passed in 1885, set out firm conditions. The opening span had to give two hundred feet of clear width, the bridge had to open at any time for any vessel regardless of delay to road traffic, and the design had to match the architecture of the Tower of London.
That last clause explains why the towers carry turrets and pointed Gothic detailing rather than plain ironwork: the design had to echo the medieval fortress standing beside it. The frame underneath, however, is entirely Victorian steel, clad in stone to produce the fortress-like look visitors see above the water today.
Building it
Work began on 22 April 1886, and the Prince of Wales laid the foundation stone two months later, on 21 June. Construction took eight years in total, with an average of four hundred thirty-two people working on site at any one time, and ten fatal accidents were recorded over the course of the build.
Two piers holding more than seventy thousand tons of concrete were sunk into the riverbed to carry the towers, and more than eleven thousand tons of steel formed the frames of the towers and high-level walkways. These frames were then clad in Cornish granite and Portland stone, giving the bridge its familiar stone-faced appearance above the water.

Horace Jones died in 1887, and Wolfe Barry took over as architect, with his colleague Stevenson replacing Jones's planned brick facade with the more ornate Victorian Gothic look the bridge carries today. The total cost ran to a little over a million pounds, and the bridge opened on 30 June 1894.
What you see
The bridge runs 940 feet long including its abutments. Each side span is a suspension bridge 270 feet long, and between the two towers the 200-foot central span splits into two equal leaves. Counterbalanced so precisely that they can be raised in five minutes, the leaves swing through an arc of eighty-two degrees, and the whole structure was built to withstand strong winds, a requirement introduced after the Tay Bridge disaster fifteen years earlier.
The high-level walkways were originally meant to let pedestrians cross while the roadway stood open to shipping, but they gained a reputation for pickpockets and were closed in 1910. They reopened in 1982 as part of the Tower Bridge Exhibition, which also takes visitors through the Victorian engine rooms below the roadway.
In 2014 sections of the walkway floor were replaced with glass, so the road and the river below are visible underfoot. One small detail rewards a careful look: a chimney on the bridge is painted to resemble a lamppost, which once served a fireplace in a guardroom inside one of the piers.
The colors you see today

Visitors often ask why the ironwork of Tower Bridge appears in blue and white rather than the stone tones of the towers. The towers and walkways themselves are faced in Cornish granite and Portland stone over a steel frame, finished in the Victorian Gothic style set by Jones's successor, Stevenson, which is what gives the bridge its fortress-like color above the water.
The painted steelwork of the bascules and suspension chains is a separate matter, and the history and dates behind the current livery are not part of the record covered here. Paint schemes on a structure this size are repainted periodically for maintenance, and the choice of color at any given time is a matter for the bridge's owners rather than the original 1894 design.
Anyone wanting the specific history of the current blue and white scheme, or details of any earlier colors, should ask at the Tower Bridge Exhibition when booking tickets, or check the official Tower Bridge website, which covers the maintenance and restoration of the structure in more depth than a general visitor guide can.
How it works now
The original lifting machinery ran on pressurized water stored in hydraulic accumulators, with four engines installed at each pier so that the bridge always had a spare in reserve. That Victorian system kept the bascules moving reliably for the bridge's first eight decades of operation, until a more modern system took over.

In 1974 the mechanism was largely replaced by an electro-hydraulic system that uses oil instead of water; only the final gear wheels are original to 1894. The retired Victorian engines remain on display in the engine rooms, part of the Tower Bridge Exhibition that visitors can tour alongside the walkways above.
River traffic still takes priority over road traffic. In the bridge's first year the leaves were raised six thousand one hundred sixty times, an average of seventeen times a day; today it happens roughly a thousand times a year. Vessels give the bridge 24 hours' notice, and opening times are published in advance with no charge to open it; pedestrians can simply walk across the roadway whenever it stands lowered.
Strange days and seeing it well
Few London structures have had stranger moments. In 1912 the pilot Francis McClean flew a floatplane between the bascules and the walkways above. In 1952 a double-decker bus found the roadway rising beneath it mid-crossing; the driver, Albert Gunter, accelerated across a gap of about three feet and dropped safely onto the far leaf.
The bridge has also taken damage in wartime and played host to diplomacy and tradition. A parachute mine exploded nearby in 1941, harming the bascules, towers and engine room, after the high-level span had taken a direct hit in 1940. In 1997 an opening split President Clinton's motorcade in two, and in 1999 a Freeman of the City drove two sheep across to exercise an ancient right.

For the best view of the whole bridge, stand on the north bank near the Tower of London or walk onto the south bank toward the Shard, where the towers rise clear of the river. The glass floors and engine rooms require a ticket, so check with the operator what to book ahead before visiting.
More from the journal
Read next
- Tower BridgeHow does Tower Bridge open?The engineering, history, and strange moments behind the bascules that let Tower Bridge open for river traffic.Read the piece →
- Tower BridgeHow do you tell Tower Bridge from London Bridge and the Tower of London?The Tower of London is a fortress, Tower Bridge is the Victorian bridge with two towers beside it, and London Bridge is a plain bridge half a mile upstream. How to tell them apart, and the story of the American who bought the wrong bridge.Read the piece →
- The Palace of Westminster and Big BenHow did the fire of 1834 start?How an overheated stove and an old stockpile of tally sticks destroyed the medieval Palace of Westminster in 1834.Read the piece →
